072 490 4296

Electrical Installations for Renovations & New Builds Cape Town

Electrical work on a renovation or new build costs least when it is decided on paper. We plan the points with your builder or architect, install in two stages around the other trades, and test and certify the work on completion.

Ask for a quote

What do you need?

Or call 072 490 4296

  • Electrical layouts are planned with your builder or architect before the walls go up.
  • First and second fix are scheduled around the other trades, avoiding chasing finished walls.
  • For homeowners and builders running renovations, extensions or new builds across Cape Town.
  • Completed work is tested and certified, with solar-ready wiring planned in from the start.
4.9 Google rating from
11 reviews

Electro-Spark handles the electrical installation for renovations, extensions and new builds in Cape Town. We plan the points with your builder or architect, install first fix alongside the brickwork and second fix once the walls are finished, and test the completed work for a certificate of compliance. Solar-ready wiring can be planned in from the start.

When should the electrical points be planned?

The electrical points should be decided on the drawings, before building starts, because that is when changes cost least. Go through the plan room by room: where the bed, desk, television and kitchen appliances will sit, where you want two-way switching, and where the outside lights, gate motor, alarm, Wi-Fi and cameras will go. Every point moved after the walls are plastered costs a chase and a patch.

We work from the architect's electrical layout where there is one and mark it up with the builder, so conduit and boxes are correctly placed before the brickwork goes up or the ceilings go on. A good layout also records which circuit each point is on, which makes fault finding on the board straightforward years later.

A rewired distribution board with neatly dressed cabling and new breakers
Rewired DB board

What are first fix and second fix?

First fix is everything that ends up hidden: conduit and boxes built into the walls or chased in, draw wires, cable runs in the roof, and the position of the board. It happens alongside the brickwork, before plaster, ceilings and tiling. Second fix follows once the walls are finished: plug and switch plates, light fittings, the breakers in the board, connections to the stove, geyser and outside lights, and then testing.

The period between the two is where renovations most often go wrong. Plasterers skim over boxes and tilers cover conduit ends. We recommend photographing each wall before it is closed up, with a tape measure in the shot, so that anyone can locate a box or a conduit run later.

Can an extension run from the existing DB board?

A small extension can often run from the existing DB board, provided it has spare ways, the main switch and supply can carry the extra load, and the board's protection is in order. An old board with no earth leakage, or a full board with breakers doubled up, points towards a new board. See DB board upgrades.

A large renovation or a second storey often has its own sub-board, fed from the main board. This keeps the new circuits together and provides a place to isolate the extension, with room to add later. If the existing wiring is old, a renovation is the most economical time to rewire, because the walls and ceilings are already open.

Planning for solar and backup during the build

Even if solar is a year or two away, a few decisions during the build avoid considerable rework later:

  • A conduit or sleeve from the roof space to where the inverter will go, for the DC cables
  • Wall space for an inverter and battery near the main board, ventilated and out of direct sun
  • Essential circuits (lights, Wi-Fi, fridge, gate, alarm) grouped so they can move onto an inverter-fed board in one step, with the geyser, stove and pool pump left on normal power
  • Room in the board layout for the changeover switching and protection a backup system needs

What if the house needs a bigger electricity supply?

A bigger supply, a change from single-phase to three-phase, or moving the meter is an application to the City of Cape Town (or to Eskom, where Eskom supplies the area), made by the property owner. A larger house with a heat pump, an induction hob, air conditioning or an EV charger can outgrow its supply. The utility quotes for its side of the work, and that part runs on the utility's timeline rather than the builder's.

Apply early. Calculating the expected load from the planned circuits and appliances shows whether the current supply is sufficient before the application goes in, and before the building programme depends on it.

If a solar or battery system is part of the plan, it has to use a City-approved inverter, be signed off professionally and be authorised by the City before it is switched on. Design the board and the inverter position with that in mind. See inverter and battery backup.

What testing and certification happen at the end?

The finished installation is tested for insulation resistance, earth continuity, polarity and earth leakage trip times, and the results go on the test report that accompanies the certificate of compliance. Under the Electrical Installation Regulations, any addition or alteration needs a CoC covering at least the new work, and a new build needs one for the whole installation.

Keep the CoC with the building plans and the circuit layout. It is the first document an insurer or a future buyer's electrician will ask for. See compliance certificates.

  • We have used Tyrone’s services for our home and industrial facility, including various electrical requirements where substantial power is involved. We have found him to be professional, reliable, and extremely knowledgeable in his field, particularly when it comes to solar energy and related systems. His workmanship is of a high standard, with no comebacks, and he always provides practical solutions to our requirements. We would definitely recommend Tyrone for quality and professional electrical services.

    Gina Filomena

    Google review

  • In a city where many people only pay lip service to rendering good service, the same is not true of Elctro Spark. In short: fantastic, efficient and reliable service. To match their service, the follow up enquiries if we were happy with the work done at our home was superb. We are entirely happy with Elctro Spark and I can highly recommend them.

    Sean Bosse

    Google review

  • We always receive the most professional service with exceptional attention to detail. Tyrone and teams after-service is truly unmatched.

    Heather Bosse

    Google review

  • Tyron is professional, ethical & reliable. I am very happy with all the work he has done for me over the last two years. He has maintained the same high standard.

    Summer Time

    Google review

  • Excellent services

    Ebrahim Samodien

    Google review

Questions we get asked

When should the electrician get involved in a renovation?

Before the building work starts, while the layout is still on paper. First fix has to happen alongside the brickwork and before plastering and ceilings, so the electrician needs to be in the builder's programme from the outset rather than called in once the walls are up.

Do I need a new DB board for an extension?

Not always. If the existing board has spare ways, working earth leakage and a supply that can take the extra load, the new circuits can go on it. A full or outdated board, or a large extension, usually means a new board or a sub-board for the new part of the house.

Who applies to the City for a bigger supply?

The application for a new or changed supply is made by the property owner. What you need from the electrician is a clear picture of the expected load, so that you apply for the correct supply size the first time.

Should I wire for solar even if I'm not installing it yet?

Yes. A conduit from the roof, space for the inverter and battery, and essential circuits grouped together cost little during a build. Adding them afterwards means lifting tiles, chasing walls and reworking the board.

Will I get a CoC for the new work?

Yes. The finished installation is tested and a CoC is issued for it. For an addition, the certificate covers the new work and sits alongside the certificate for the rest of the house.

Get a quote

Send the details and we'll come back to you by email or phone. For anything urgent, call.

Monday to Friday
08:00–17:00
Saturday
09:00–13:00
What do you need?

Or call 072 490 4296

Call WhatsApp
Chat on WhatsApp